Nursai Energy provides expert solution and engineering services in design works for the construction and operation of compressor stations and power plants, turbine overhaul, commissioning, maintenance of the lower, middle and upper levels of APCS, provision of technical support services through the involvement of Original Equipment Manufacturers (OEMs) from all over the world.
Customer focus and long-term perspective
Openness to establishing effective, fair and mutually beneficial cooperation
Expansion of the range of services provided and their continuous improvement
Responsible approach in all aspects of activity
High-quality implementation of all tasks
Proactive at work
Increase of capacity of the Kazakhstan China Gas Pipeline.
Operation and maintenance of the SGT400 gas turbine and Siemens centrifugal compressor.
Construction and maintenance of a power plant which consists of four combined cycle power units with a total capacity of 456 MW (4*6 FAs).
Sredneuralskaya Recirculating Hydroelectric Power Station (Ekaterinburg city). Combined cycle plant with a total capacity of 410 MW.
Increase of capacity of the Kazakhstan China Gas Pipeline.
Maintenance of PTS 916 compressors.
Commissioning of a water fire extinguishing system with a Marioff high pressure pump.
Maintenance of PTS 916 compressors, boosters, maintenance.
Technical service of compressors, boosters.
Provision of technical support services through the involvement of OEMs.
Rendering services on technical maintenance, of SCADA systems, APCS equipment at BSGP facilities.
Customer: Asia Gas Pipeline LLP
Brief description of SOW: Increase of capacity of the Kazakhstan China Gas Pipeline. Compressor station construction - 3x PGT 25 DLE and 3x PSL 502/N compressors. Compressor station construction - 3x PGT 25 DLE and 3x PSL 502/N compressors.
Period: 2017-2018.
Customer: KTR KazTurboRemont
Brief description of SOW: Operation and maintenance of the SGT400 gas turbine and Siemens centrifugal compressor.
Period: 2016.
Customer: Deena Energy SERVICES LTD
Brief description of SOW: Pregolskaya TPP (Kaliningrad, Russia). Construction and maintenance of a power plant which consists of four combined cycle power units with a total capacity of 456 MW (4*6 FAs). Consultation on mechanical work, PG6111 (FA) installation work of equipment and accessories. Installation supervision of GE equipment. Operation and maintenance of the power plant.
Period: 2017-2020.
Customer: Deena Energy SERVICES LTD
Brief description of SOW: Sredneuralskaya Recirculating Hydroelectric Power Station (Ekaterinburg city). Combined cycle plant with a total capacity of 410 MW. Bearing inspections.
Period: May, 2018
Customer: Tamyr LLP
Brief description of SOW: Increase of capacity of the Kazakhstan China Gas Pipeline. Commissioning of GE PGT 25 gas turbines and GE PSL 502 / N compressors. Commissioning of Mark VIe control panels, commissioning of MCC panels with tuning by AF650GP variable frequency drives, tuning of Bentley Nevada3500 vibration system, HiMatrix fire and gas detection system. Warranty support-2 months.
Period: 2017-2019.
Customer: KTR KazTurboRemont
Brief description of SOW: Maintenance of PTS 916 compressors. Timely resolution to problems, change of pressure setpoints from the control panel, etc.
Period: 2018-2019.
Customer: Deena Energy SERVICES LTD
Brief description of SOW: Commissioning of a water fire extinguishing system with a Marioff high pressure pump.
Period: August-September, 2018.
Customer: Kazakhstan Max Cooper Oiltech LLP
Brief description of SOW: Compressor stations CS-6 and CS-7.Works on replacement of Eagle Burgmann dry gas seals on Rolls Royce RFBB 36 compressors.
Period: October 2018 – October 2019.
Customer: KTR KazTurboRemont
Brief description of SOW: Sour Gas Re-Injection Project, Kashagan D-Island, NCOC. Overhaul of the GE MS5002D Turbine in the Sour Gas Re-Injection Project, Kashagan D-Island, NCOC.
Period: March – May, 2019.
Customer: Atlas Copco Russia
Brief description of SOW: Maintenance of PTS 916 compressors, boosters, maintenance. Timely troubleshooting, changing pressure setpoints from the control panel, etc.
Period: from February 2019.
Customer: KTR KazTurboRemont
Brief description of SOW:Technical service of compressors, boosters. Timely troubleshooting, changing pressure setpoints from the control panel, etc.
Period: from December 2018.
Customer: Atlas Copco Russia
Brief description of SOW: Maintenance of PTS 916 compressors. Timely troubleshooting, change of pressure setpoints from the control panel, etc.
Period: from March 2019 to January 2020.
Customer: Atlas Copco Airpower Central Asia LLP
Brief description of SOW: Maintenance of PTS 916 compressors. Timely troubleshooting, change of pressure set points from the control panel, maintenance, repair.
Period: March – June, 2019.
Customer: Atlas Copco Airpower Central Asia LLP
Brief description of SOW: Maintenance of PTS 916 compressors. Timely troubleshooting, change of pressure set points from the control panel, maintenance, repair.
Period: 2019.
Customer: KKS-Sicim
Brief description of SOW: Commissioning works at the Karachaganak processing complex. Commissioning works at the facilities of KPC, KGDBN.x
Period: from July 2020
Customer: KPO B.V.
Brief description of SOW: Provision of technical support services through the involvement of OEMs. Supply of equipment and spare parts, organization of equipment repair and maintenance services.
Period: from July, 2020 (2+1)
Customer: Sapa Software LLP
Brief description of SOW: Rendering services on technical maintenance, of SCADA systems, APCS equipment at BSGP facilities: CS Karaozek, GMS Akbulak, CS Bozoy, GMS Bozoy, MCC Kyzylorda, MC Almaty and the Linear Part of the highway (0-1475 km), supply of spare parts. Work with PLC, DCS, RTU and SCADA brands such as Allen Bradley, ABB, Siemens, Honeywell.
Period: October 2020 - April 2021.