Customer: Tamyr LLP
Brief description of SOW: Increase of capacity of the Kazakhstan China Gas Pipeline. Commissioning of GE PGT 25 gas turbines and GE PSL 502 / N compressors. Commissioning of Mark VIe control panels, commissioning of MCC panels with tuning by AF650GP variable frequency drives, tuning of Bentley Nevada3500 vibration system, HiMatrix fire and gas detection system. Warranty support-2 months.
Period: 2017-2019.
Brief description of SOW: Increase of capacity of the Kazakhstan China Gas Pipeline. Commissioning of GE PGT 25 gas turbines and GE PSL 502 / N compressors. Commissioning of Mark VIe control panels, commissioning of MCC panels with tuning by AF650GP variable frequency drives, tuning of Bentley Nevada3500 vibration system, HiMatrix fire and gas detection system. Warranty support-2 months.
Period: 2017-2019.